OPEN
§0 / Statement 2026 · WINDOWS · DOORS · [NEW MATERIALS]

Things that open, divide, and hold light.

01 ·

Cadence is a material studio. Two product lines today (windows · doors), with surfaces and hardware in development. Every object is drawn to a single set of proportions and details.

03 ·

Objects
06 / shipping
In dev
02
Lead
10–14 wks
Std
CSA·A440.2
§1

Index

08 OBJECTS · 04 LINES
CODE ID OBJECT LINE STATUS
WIN.FIX C-W01 Fixed Window Windows SHIPPING
WIN.TIT C-W02 Tilt & Turn Windows SHIPPING
WIN.CAS C-W03 Casement Windows SHIPPING
DOR.SLD C-D01 Sliding Patio Doors SHIPPING
DOR.LFT C-D02 Lift & Slide Doors SHIPPING
DOR.ENT C-D03 Entry Doors SHIPPING
SUR.PNL C-S01 Panel Surfaces IN DEV
HDW.STD C-H01 Hardware Set Hardware IN DEV
§2

Objects

DETAIL VIEW
01 WIN.FIX SHIP

Fixed Window

Large-format fixed glazing. Slim aluminium frame.

U-value
0.21 W/m²·K
Sightline
38 mm
Glass
Triple low-E
02 WIN.TIT SHIP

Tilt & Turn

Operable European-style. Secure ventilation, full inswing access.

U-value
0.24 W/m²·K
Hardware
Multi-point
Open
Tilt · Turn
03 WIN.CAS SHIP

Casement

Side-hinged operable. Crank operation, tight air seal.

U-value
0.26 W/m²·K
Hardware
Crank
Air
Class A3
04 DOR.SLD SHIP

Sliding Patio

Two- and three-panel sliders. Low threshold. Wide opening.

Panels
2 · 3
Threshold
12 mm
Open
2.4 m max
05 DOR.LFT SHIP

Lift & Slide

Oversized panels. Engineered glide. Thermal-sealed meeting stile.

Panels
Up to 4
Glide
Lift mech.
Width
6.0 m max
06 DOR.ENT SHIP

Entry

Insulated aluminium entry. Multi-point hardware. Matched profiles.

Lock
Multi-point
Core
PUR foam
Glass
Optional sidelights
07 SUR.PNL DEV

Panel

Architectural panels and linings sharing the envelope finish family.

Stage
Design
Target
2026 Q4
Pilot
Open
08 HDW.STD DEV

Hardware Set

Pulls, hinges, operators in the catalogue finish family.

Stage
Prototype
Target
2027 Q1
Pilot
Selecting
§3

Spec

SYSTEM TOKENS

A single system,
shared across every object.

Every Cadence object draws from one library of materials, gaskets, and hardware. Specify a window — you have specified everything next to it.

01 Frame
Extruded aluminium · 6063-T6
02 Glass
Triple-glazed · 4-16-4-16-4 · Low-E²
03 Spacer
Warm-edge · stainless
04 Gas fill
Argon · 90% concentration
05 Air seal
EPDM gaskets · double line
06 Hardware
Forged stainless · multi-point
07 Finish
Anodized · powder coat · matched
08 Test
CSA A440.2 / NAFS-11
§4

System

THE THREE RULES
  1. 01

    One language.

    Every object in the catalogue is drawn against the same library of proportions, finishes, and details.

  2. 02

    One supplier.

    A window and a door share more than a maker. They share an extrusion run, a gasket, and a finish.

  3. 03

    One schedule.

    Cadence ships against the project, not a forecast. Lead time is committed at PO and tracked to the day.

§5

Request

OPEN A FILE

Open a request.
Get a response in two days.

  • Send drawings, opening schedule, or a sketch — anything is enough to begin.
  • We respond inside two business days with configurations, lead time, and documentation.
  • One named lead, from open to install.

FILE.ID = AUTO · OPEN UNTIL ARCHIVED · STUDIO MTL · PLANT TSN

// REQUEST FORM · v1

07 / 07 Grid ← Gallery